¸£Àû×ÅÆ¬

The University of Southampton
SUSSED News

Investing in the Hartley Library: Level 3 refurbishment

The University is investing in improving the Library study and learning environment. This Hartley Library Project is scheduled to last from 12 September – 17 October.

Click to view larger image

The refurbishment project will bring the following benefits:

  • Investment in new furniture to create 71 additional new study spaces
  • Installation of desktop power supplies
  • New breakout areas with comfortable seating
  • Group study spaces with large screen displays and WiFi access
  • New wall and floor surfaces

From Monday 12 September access to Hartley Library, Level 3 will be via the footstep indicated route from Level 2, down to Level 1 and up the rear staircase. All stock located on Level 3 will be accessible as usual.

If you have any questions or comments please speak to the staff in the Library or email: libenqs@soton.ac.uk


sms-library-refresh

SUSSED News can now be found within the MySouthampton app, the image above will be displayed in the app for this post. If you haven’t yet downloaded the app to your mobile phone or tablet you can  or directly from your app store.

 
Share this post